ABOUT THE PROJECT

Mysore – Kushalnagara
Highway Development

Mysore Kushalnagara Highways Pvt Ltd is responsible for the development of the access-controlled four-lane highway project on National Highway 275 (NH-275) connecting Mysuru and Kushalnagara. The project plays a crucial role in improving transportation infrastructure and strengthening connectivity between Mysuru and the Kodagu region.

Developed under the Bharatmala Pariyojana initiative, the project aims to enhance road safety, reduce travel time, and support economic development across Karnataka. With modern engineering practices and efficient project execution, the highway is designed to provide safer, faster, and more reliable travel for commuters and transport networks.

Project Overview

Mysore – Kushalnagara Highway Project Details

Project Construction of access controlled four laning with paved shoulder from Mysore to Kushalnagara section of NH-275 from Design Ch. Km 122+200 (Existing Km 124.488) near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 near Hemming Village / SH-21 Hassan–Periyapatna Road Junction on Hybrid Annuity Mode under NH(O) in the state of Karnataka (Package-II)
Mode of Execution Hybrid Annuity Mode (HAM)
No. of Lanes / Configuration Four Lanning (04 Lane) with Paved Shoulder
Length 22.700 Km
Tender Cost Rs. 617.14 Crores
Awarded Cost Rs. 585.84 Crores
Authority National Highways Authority of India (NHAI)
Concessionaire Mysore Kushalnagara Highways Private Limited
EPC Contractor D.Y. Uppar & Sons
Bid Submission Date 16 February 2023
Date of Award (LOA) 10 March 2023
Contract Agreement Date 19 July 2023
Appointed Date 08 December 2025
Construction Period 24 Months from Appointed Date (Completion: 07 December 2027)
Concession Period 15 Years from COD

00Km

Total Project Length

00Km+

Greenfield Bypass

00Km+

Existing Alignment

00

Lane Highway Development

PROJECT SCOPE

Scope of Mysore – Kushalnagara Highway Project

The Mysore – Kushalnagara Highway project involves the development of an access-controlled four-lane highway on National Highway 275 (NH-275). The project aims to improve regional connectivity, enhance road safety, and support economic growth across Mysuru and Kodagu districts.

Construction of access-controlled four-lane highway
Paved shoulders for improved road safety
Development under Bharatmala Pariyojana
Hybrid Annuity Mode (HAM) implementation
Project Length: Approximately 22.7 km
Existing Alignment: 5.880 km
EGreenfield Bypass (Kushalnagara & Periyapatna): 16.820 km
Start Point: Km 122+200 near Guddehosur (Start of Kushalnagara Bypass)
End Point: Km 144+900 near Hemming Village / SH-21 Junction

Project Location

Project Location & Key Plan

The project corridor lies within the southern region of Karnataka and passes through the districts of Kodagu and Mysuru. The highway forms an important transportation link connecting the coastal belt with the interior regions of the state, improving regional mobility and accessibility.

Project Location Map

Project Location Map

Overview map showing the location of the Mysore – Kushalnagara highway corridor.

Project Location Map

Key Plan Map

Detailed key plan indicating major towns, junctions and highway alignment.

Project Location Map

Alignment Map

Illustration of the highway alignment including bypass sections and existing corridors.

Work Progress

Project Progress

The Mysore – Kushalnagara Highway project is progressing through structured construction phases as defined in the concession agreement, ensuring timely completion and efficient execution of all project components.

Project Milestones

Project execution follows the milestones defined in the Concession Agreement to ensure systematic development and timely completion of the highway project.

Payment Milestones

Milestones are structured to ensure progress-linked payments based on construction achievements and successful completion of project stages.

Utility Shifting Status

Utility shifting activities are carried out in coordination with relevant authorities to avoid disruptions and support smooth project execution.

Monthly Progress Report

Latest project progress reports are available for review and documentation to track the construction status and development updates.